This report provides a list of all interventions on instruments and equipment programmed and extraordinary, for each month of the period. Each intervention, whether already carried out, shows: time, cost and labour cost of eventually components used.
Print card looks like in Figure:
- Fill in the fields To date/to date, according to the period of interest.
- Fill in the fields from(/to) instrum/tool/eq. code., depending on the data that interest you:
- to print the planning worksheet of all the tools, do not specify any code in the two fields.
- specify two different codes, to get the schedule of operations related to the tools included in the specified range.
- If you do not specify the first code will print the schedule of operations from the first list tool, up to the number specified in the second field; Conversely, specifying the first field and not the second will print the schedule of operations starting from the specified tool, until the end of the archive. The <F2> button or
opens “the General list”.
- Tick the “Check to show individual movements” box if you want the details of every single movement.
The “A video”button displays the print preview; from the preview window you can then print.
The “Print” button executes the print request.
In the field “Printer” you can change the default printer.
As for the buttons in the print preview, see the example section.